| European Data Center 3rd Module |
Tekirdağ / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4,35 MW |
Ongoing |
|
| Project Area |
White Space Area |
Role in the Project |
| 7.300 sqm |
2.650 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
| Ankara Data Center 4th Module |
Ankara / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4 MW |
Ongoing |
|
| Project Area |
White Space Area |
Role in the Project |
| 5.450 sqm |
2.750 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
| Vodafone & DAMAC Digital Veri Merkezi |
İzmir / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 12 MW |
4 MW |
Ongoing |
|
| Project Area |
White Space Area |
Role in the Project |
| 11.838 sqm |
1.500 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
| Data Center Campus |
Cologne / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 100,0 MW |
80,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 50.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit, Building Application |
General Planning |
|
| Data Center with Office Building |
Cologne / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 20,0 MW |
16,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 15.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit, Building Application |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 84,0 MW |
70,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 70.000 sqm |
Execution Planning |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 24,0 MW |
16,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 15.000 sqm |
Execution Planning |
Architectural |
|
| Data Center with Office Building |
Berlin / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 180,0 MW |
150,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 110.000 sqm |
Tech DD, Test Fit Planning, Building Application (expected) |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 126,0 MW |
105,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
| 90.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 100,0 MW |
80,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 48.000 sqm |
Construction Management |
Architectural |
|
| Data Center with Office Building |
Berlin / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 9,6 MW |
7,5 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 5.500 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 46,0 MW |
38,0 MW |
Ongoing |
|
| Project Area |
Role in the Project |
Scope |
| 31.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Application |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 14,4 MW |
12,0 MW |
2017 - 2018 |
|
| Project Area |
Role in the Project |
Scope |
| 11.400 sqm |
Execution Planning, Tendering, Construction Management |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 14,4 MW |
12,0 MW |
2018 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 11.225 sqm |
Execution Planning, Tendering, Construction Management |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 14,4 MW |
12,0 MW |
2018 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 11.225 sqm |
Execution Planning, Tendering, Construction Management |
Architectural |
|
| Building Extension and Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 2,4 MW |
2,0 MW |
2018 |
|
| Project Area |
Role in the Project |
Scope |
| 2.770 sqm |
Design & Permitting |
Architectural |
|
| Data Center Campus |
Offenbach a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 450,0 MW |
350,0 MW |
2018 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 119.300 sqm |
Design, Permitting & Tendering |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 45,0 MW |
32,0 MW |
2018 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 32.000 sqm |
Design & Permitting |
General Planning |
|
| Conversion into a Data Center |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 0,0 MW |
0,0 MW |
2018 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 1.500 sqm |
Construction Management |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 20,0 MW |
16,0 MW |
2017 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 20.000 sqm |
Design, Permitting, Execution Planning & Construction Management |
General Planning |
|
| Building Extension and Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 12,5 MW |
10,0 MW |
2017 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 8.000 sqm |
Design, Permitting & Execution Planning |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 18,5 MW |
14,0 MW |
2017 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 15.000 sqm |
Design, Permitting, Execution Planning & Construction Management |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 7,8 MW |
6,5 MW |
2018 - 2019 |
|
| Project Area |
Role in the Project |
Scope |
| 9.600 sqm |
Design, Permitting, Execution Planning & Construction Management |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 7,8 MW |
6,5 MW |
2019 - 2020 |
|
| Project Area |
Role in the Project |
Scope |
| 9.000 sqm |
Design & Permitting |
General Planning |
|
| Data Center Campus |
Liederbach i.Ts. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 120,0 MW |
100,0 MW |
2021 |
|
| Project Area |
Role in the Project |
Scope |
| 69.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Sulzbach / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 48,0 MW |
24,0 MW |
2021 - 2022 |
|
| Project Area |
Role in the Project |
Scope |
| 19.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center Campus |
Dexheimc / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 800,0 MW |
670,0 MW |
2021 - 2023 |
|
| Project Area |
Role in the Project |
Scope |
| 600.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Mainz / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 28,8 MW |
24,0 MW |
2022 |
|
| Project Area |
Role in the Project |
Scope |
| 9.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 14,4 MW |
12,0 MW |
2022 |
|
| Project Area |
Role in the Project |
Scope |
| 14.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 100,0 MW |
80,0 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 47.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Offenbach a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 14,4 MW |
12,0 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 13.200 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center Campus |
Cologne / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 230,0 MW |
190,0 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 123.000 sqm |
Tech DD, Test Fit Planning & Consulting, Audit |
General Planning |
|
| Data Center with Office Building |
Barcelona / Spain |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 20,0 MW |
16,8 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 15.000 sqm |
Tech DD, Design, Permitting & Project Management |
General Planning |
|
| Data Center with Office Building |
Mainz / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 29,0 MW |
24,2 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 10.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Cologne / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 60,0 MW |
50,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 45.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Cologne / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 60,0 MW |
50,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 40.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
İstanbul / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 40,0 MW |
32,0 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 30.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
London / United Kingdom |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 86,0 MW |
72,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 32.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
London / United Kingdom |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 130,0 MW |
110,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 85.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Milan / Italy |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 120,0 MW |
100,0 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 45.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Marseille / France |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 60,0 MW |
50,0 MW |
2024 |
|
| Project Area |
Role in the Project |
Scope |
| 30.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 9,6 MW |
7,5 MW |
2022 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 5.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
Architectural |
|
| Data Center with Office Building |
Cologne / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 9,6 MW |
7,5 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 12.000 sqm |
Tech DD, Test Fit Planning & Consulting |
Architectural |
|
| Data Center with Office Building |
Leipzig / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 12,0 MW |
10,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
| 17.000 sqm |
Tech DD, Test Fit Planning & Consulting |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 9,6 MW |
7,5 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 11.000 sqm |
Execution Planning |
Architectural |
|
| 10 Edge Data Center with Offices |
Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 7,2 MW |
6,0 MW |
2022 - 2023 |
|
| Project Area |
Role in the Project |
Scope |
| 7.000 sqm |
Design & Permitting Process Consulting |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 54,0 MW |
45,0 MW |
2024 |
|
| Project Area |
Role in the Project |
Scope |
| 50.000 sqm |
Tech DD & Consulting |
General Planning |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 12,0 MW |
10,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 9.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
General Planning |
|
| Data Center with Office Building |
Norway |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 40,0 MW |
35,0 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 11.000 sqm |
Tech DD |
General Planning |
|
| 3 Edge Data Center with Offices |
Denmark |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 5,4 MW |
4,5 MW |
2023 |
|
| Project Area |
Role in the Project |
Scope |
| 1.500 sqm |
Tech DD |
General Planning |
|
| Data Center with Office Building |
Neu-Isenburg / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 9,6 MW |
7,5 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 10.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Application |
Architectural |
|
| Data Center with Office Building |
Frankfurt a.M. / Germany |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 12,0 MW |
10,0 MW |
2023 - 2024 |
|
| Project Area |
Role in the Project |
Scope |
| 9.000 sqm |
Consulting |
Architectural |
|
| Gebze Data Center Building 2nd Module Construction Project |
Kocaeli / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 10 MW |
3 MW |
2018 - 2018 |
|
| Project Area |
White Space Area |
Role in the Project |
| 4.250 sqm |
2.000 sqm |
TURNKEY Construction MEP Works |
|
| Gebze Data Center Building 3rd Module Construction Project |
Kocaeli / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 10 MW |
3 MW |
2018 - 2018 |
|
| Project Area |
White Space Area |
Role in the Project |
| 4.250 sqm |
2.000 sqm |
TURNKEY Construction MEP Works |
|
| European Data Center Building |
Tekirdağ / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 20 MW |
4 MW |
2019 - 2020 |
|
| Project Area |
White Space Area |
Role in the Project |
| 43.000 sqm |
6.800 sqm |
TURNKEY Construction MEP, Data Hall Infrastructure Works |
|
| Gebze Data Center Building 4th Module Construction Works Project |
Kocaeli / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4 MW |
2021 - 2022 |
|
| Project Area |
White Space Area |
Role in the Project |
| 4.250 sqm |
2.000 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
| Gebze Data Center Building 5th Module Construction Works Project |
Kocaeli / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4 MW |
2022 - 2023 |
|
| Project Area |
White Space Area |
Role in the Project |
| 4.250 sqm |
2.000 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
| Ankara Data Center 2nd Module |
Ankara / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4 MW |
2022 - 2023 |
|
| Project Area |
White Space Area |
Role in the Project |
| 5.450 sqm |
2.750 sqm |
TURNKEY Construction MEP, Data Hall Infrastructure Works |
|
| Ankara Data Center 3rd & 7th Modules |
Ankara / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4,9 MW |
2023 - 2024 |
|
| Project Area |
White Space Area |
Role in the Project |
| 7.700 sqm |
2.840 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
| European Data Center 2nd Module (in provisional acceptance phase) |
Tekirdağ / Türkiye |
|
| MW Total Power |
IT Power |
Project Duration |
Customer |
| 13 MW |
4 MW |
2023 - 2024 |
|
| Project Area |
White Space Area |
Role in the Project |
| 6.600 sqm |
2.200 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|